Case Studies

Permanent, Sustainable Highway Maintenance

Our Work in Action

Explore a selection of Platinum 3Sixty projects demonstrating our expertise in permanent, low-carbon maintenance and reinstatement works across the UK network.

A41 Brent Cross Interchange

A41 Brent Cross Interchange

Permanent Elastomac repair and reinstatement at one of London’s busiest interchanges, improving durability and reducing reactive maintenance.

View Case Study
A406 Crooked Billet to Waterworks Corner

A406 Crooked Billet to Waterworks Corner

Elastomac joint repair and surface reinstatement delivering zero-waste installation and long-term performance.

View Case Study
A406 North Circular Rd Sterling Way

A406 North Circular Rd – Sterling Way

Non-invasive concrete repair using Elastomac as an overlay system protecting the failing concrete from water ingress.

View Case Study
Eurotunnel Freight Underpass Deep Repair

Eurotunnel Freight Underpass – Deep Repair

Structural repair using layers of Elastomac to give maximum strength in one of Britain's busiest freight lanes

View Case Study
© 2025 Platinum 3Sixty Ltd | All Rights Reserved | Website by NinetyFour Web Design Agency