Our Work in Action
Explore a selection of Platinum 3Sixty projects demonstrating our expertise in permanent, low-carbon maintenance and reinstatement works across the UK network.
A41 Brent Cross Interchange
Permanent Elastomac repair and reinstatement at one of London’s busiest interchanges, improving durability and reducing reactive maintenance.
View Case Study
A406 Crooked Billet to Waterworks Corner
Elastomac joint repair and surface reinstatement delivering zero-waste installation and long-term performance.
View Case Study
A406 North Circular Rd – Sterling Way
Non-invasive concrete repair using Elastomac as an overlay system protecting the failing concrete from water ingress.
View Case Study
Eurotunnel Freight Underpass – Deep Repair
Structural repair using layers of Elastomac to give maximum strength in one of Britain's busiest freight lanes
View Case Study